(1) A natural buffer strip must be maintained between the working edge of an excavation and a road or right-of-way as follows:
(a) A natural buffer strip at least 150 feet wide must be maintained between the working edge of an excavation and a road designated as a scenic highway by the Department of Transportation.

(b) A natural buffer strip at least 100 feet wide must be maintained between the working edge of an excavation and any public road not designated as a scenic highway by the Department of Transportation.

(c) A natural buffer strip at least 25 feet wide must be maintained between the working edge of a topsoil excavation and any public road not designated as a scenic highway by the Department of Transportation.

(d) A natural buffer strip at least 50 feet wide must be maintained between the working edge of an excavation and any public right-of-way that does not contain a road. The width of a natural buffer strip adjacent to a public road or right-of-way may be reduced if there is a public entity or entities with authority to grant permission and the applicant receives permission from each authority in writing.

(e) A natural buffer strip at least 50 feet wide must be maintained between the working edge of an excavation and any private road or right-of-way. If a private road is contained within a wider right-of-way, the buffer is measured from the edge of the right-of-way. The width of the natural buffer strip adjacent to a private road may be reduced if the applicant receives written permission from the person or persons having a right-of-way over the private road.
 
(2) A distance specified in this subsection is measured from the outside edge of the shoulder of the road or edge of the right-of-way unless otherwise specifically provided. A variance from Subsection (b), above, is available from the Maine Department of Environmental Protection.